Category Archives: Acrylic Sport Surfacing Systems

Substitution Request Form – SportMaster Sport Surfaces

Substitution Request Form

Fill out this form and click Download PDF. You can then email or print it for the Architect/Engineer review.
Not an official AIA/ASLA form; use is subject to the project’s Contract Documents and substitution procedures.

1) Project & Request Information

2) Contract Document Reference

3) Specified Item vs Proposed Substitute

4) Impacts

5) Supporting Documentation

Attachments are not embedded into the PDF in this simple version. Add links or list what you’ll include when emailing.

6) Certifications & Acknowledgements

I certify the proposed substitution is compatible with related materials/systems and appropriate for the intended application.
I certify I have provided sufficient information to evaluate compliance with the Contract Documents (performance/quality/warranty intent).
I acknowledge acceptance of a substitution does not modify other Contract Document requirements unless specifically stated in writing.
If accepted, I will coordinate and provide all modifications needed to fully integrate the substitution (including related work by others).
If accepted, I acknowledge responsibility for redesign/review costs and special inspections caused by the substitution if required by the project procedures.
Follow the project’s Substitution Procedures (often Section 01 25 00) regarding timing, routing, and required documentation.

7) A/E / Owner Review (on PDF)

Included on the PDF for printing/signature or email routing.

Tip: After downloading, email the PDF to the Architect/Engineer/Owner Rep or print it for signature.